The Solution
Bradbury Group worked with SSE to determine their requirements, and established that our LPS 1175 SR2 doorsets would be the most suitable.
Our dedicated team of engineers developed a bespoke threshold for all SSE specification doorsets, which is countersunk and bolted on a silicon bed to prevent water ingress, and removable to allow switchgear transfers. Extra reinforcing has been designed into the door leaf, and bespoke kick plates and protection prevents the underside of the door from snagging on the often rough terrain. Mico Elite single point locking systems ensure that would-be vandals or intruders cannot damage or force the lock, ensuring all substations remain secure and functioning.
To date, over 150 M2M2 doorsets have been installed into SSE sites across the UK.