Best. Efficient. Fair

Project:
UK Power Networks

Client:
Adler & Allan

Project at a glance
The key facts and figures
Project: UK Power Networks
Client: Adler & Allan
Location: South East, UK
Products used: M2MFL
Completed by: Bradbury Security

The Overview

Our partner, Adler & Allan, had a request to provide a solution to mitigate against the new government directives of protecting against a 1/1000 chance of flooding at a critical site in the South East for UK Power Networks. They required a combination of both flood and security protection on this site.

The Solution

As the client required a combination of both flood and security defense, our M2M2FL was the ideal product solution. Our flood doors have been successfully tested to PAS 1188-1:2014, with a designated maximum water depth of 840mm. Combining flood resistance with security, the doors for the project were also LPCB certified to LPS 1175 SR2, helping to protect a UK infrastructure site from would-be thieves and vandals.

Our product mix combined with Adler & Allan’s on-site project management and flood expertise, meant they were the perfect partner to complete the works for a very happy UKPN.

Gallery

Stay connected

Did you know that Bradbury Group is on #Youtube?

Visit our channel via the link below to view our brand film, attack test videos, installation guides, and more.

Subscribe to our channel to stay up to date with our latest activity and uploads.

https://t.co/pHDEoR4v2U