The key facts and figures

The Overview
Western Power Distribution (WPD) had a requirement to provide a solution to upgrade the door to one of their substations. This particular site required the door to be aesthetically pleasing due to the sensitive nature of the conservation area, as well as providing a good level of security to the site.
The Solution
Our long-term partner, T&A Maintenance, has many years’ experience of both our products and working with Western Power Distribution. Working together, we produced a product mix that would suit this unique site. The site had a large opening and therefore required a bi-fold solution. The client also required secure cable access for generator cables. These were incorporated into the bi-fold doorset, providing a tailored solution for the site.
Our product solution, along with the expert installation by T&A Maintenance, left the client with a secure site that blended in with the surroundings of its conservation setting.